[Installation Example] Solar Power Plant at the Northern Gymnasium, Suzaka City, Nagano Prefecture
Auxiliary facilities include emergency power supply systems for the gymnasium! Introduction of a case where solar power generation was installed on top of the gymnasium.
We would like to introduce a case study of our solar power generation roof leasing business conducted at the Northern Gymnasium in Suzaka City, Nagano Prefecture. Solar panels with a generation output of 67.5 kW and a power conditioner with a generation output of 49.5 kW have been installed on the gymnasium roof. The accompanying equipment includes one set of emergency power supply equipment for the gymnasium and one set of solar power generation display equipment. 【Overview】 ■ Completion Date: November 2013 ■ Location: Suzaka City, Nagano Prefecture ■ Generation Output (Modules): 67.5 kW ■ Generation Output (Power Conditioner): 49.5 kW *For more details, please refer to the PDF document or feel free to contact us. Sun Junior HP - https://www.sunjunior.co.jp/
- Company:サンジュニア 本社
- Price:Other